Another success for the HEX
4th of September 2009In order to isolate existing perforations, unknown restrictions due to a tubing collapse had to be overcome.
Two HEX 386-700 bridge plugs and a Gauge Hanger (GH) 288-700 were successfully set in a 7”29# tubing at the Gullveig field. The results of this project brought the production of this well to 600 Sm³/d oil and 1 MSm³/d of gas.